Charger Specialist

Guide

How long does EV charger installation take?

From the moment the electrician arrives to the first charging session, a straightforward install is usually done in half a day. Complex jobs — long cable runs, switchboard upgrades, three-phase — can stretch across two visits.

Before the install

Most licensed installers will do a short phone or on-site check before quoting.

For anything involving a switchboard upgrade or three-phase supply, they'll usually book an inspection first.

On the day

Simple installs (switchboard near parking, existing capacity): 2–4 hours.

Longer cable runs or wall/ceiling routing: 4–6 hours.

Switchboard upgrade or complex three-phase work: sometimes a second visit.

After the install

You'll receive a Certificate of Electrical Safety (or state equivalent).

Any state or utility rebate paperwork is usually lodged by the installer.

First full charge should happen the same night for most homes.

Ready to compare quotes?

One short form. Multiple quotes from licensed local installers. You compare and choose — free, no obligation.

Free · ~60 seconds · No obligation