Charger Specialist

Guide

Do I need a switchboard upgrade for an EV charger?

Not every home needs a switchboard upgrade to add an EV charger, but a decent proportion do. It's the single biggest hidden cost in an EV charger install, so it pays to know what to look for before you get quotes.

Signs your switchboard probably needs work

Ceramic fuses, a wooden backing board, or asbestos backing — these boards were never designed for modern loads.

No main switch RCD (safety switch) covering the whole board.

The board is already full and there's no spare space for a new charger circuit.

Your main supply cable is undersized — most licensed installers will spot this on a site visit.

Typical upgrade costs

Adding a dedicated EV circuit and RCD in an already-modern board: usually included in the install quote.

A partial upgrade (new main switch, RCD, tidy-up): commonly $600–$1,200.

A full switchboard replacement: commonly $1,800–$3,500 depending on complexity and asbestos handling.

How to avoid surprises

Send installers a clear photo of your switchboard before they quote — most will price the job accurately from that.

Ask specifically whether the quote includes any switchboard work, or whether that would be a separate line item.

If two out of three installers flag the same issue, it's real — don't just pick the quote that ignored it.

Ready to compare quotes?

One short form. Multiple quotes from licensed local installers. You compare and choose — free, no obligation.

Free · ~60 seconds · No obligation